Solar Civil Graded
I did Mower maintenance and built gravel rings around inverters. I also made sure to fill in rods in between the rows. I also did raking and seed spreading.
Solar General Laborer
I was at a 500 megawatt site doing install from start to finish and also I did racking QC racking normal and QC for both and also QC hot fix. Then I was in Michigan River Fork 250 mega Juan and I was install mainly there, but I also worked on Novato‘s solar system and did electrical and racking also.