I am Looking to continue my career in the solar industry. I trying to get more experience in the module installation or the Qa/Qc side of solar but have no issues learn or doing other things. I prefer utility size projects.
Quality Manager
I was the Quality Manager for the commission phase of a 75mw solar site. I had 4 personal working for me to ensure everything was built to engineering specifications. It was a next tracker system with battery storage.
Racking Installer
I attached the torque tube to the pile. I was responsible for tighting every nut to proper torque. this was a Array solar system. it was 125 MW field.
Qa/qc General Foreman
I inspected all piles, torque tube, modules and wire management to make sure each step was installed to exact speciation. Was responsible for remediating any issues or flags we find. Sol-tech system.
Qa/qc Superintendent
I was the superintendent for all QA/QC. I ran 5 Crews that were responsible for doing quality control checks and the remediation. I had a crew responsible for verify all racking and torque tubes were done to specifications. I had a crew responsible for all module quality control. I had a crew responsible for all final punch list which were responsible for verifying all remediation was completed. I had 2 crew that handle remediation one for racking and torque tubes and one that handled all module remediation. This project was 325 MW. We ... Read More
no.history.found
High School Diploma
Jul, 2005 - Mar, 2007
OSHA 10
Dec, 2023 to CurrentOSHA 30
Dec, 2023 to CurrentCPR Certification
Dec, 2023 to CurrentNABCEP Certification
Dec, 2023 to CurrentChief Operating Officer | Blue Ridge Power
Director Of Electrical Operations | All Energy Solar
Director Of Operations | All Energy Solar