As a Mechanical Superintendent at Rosendin, I oversee pile operations, foundation management, and complete mechanical installs for large-scale solar projects across multiple states. With over 9 years of experience in the solar industry, I have gained extensive knowledge and skills in various mechanical and racking systems, pile machines, and logistics processes, enabling me to deliver high-quality results on time and within budget.
I excel at managing multiple subcontractors, vendors, and support teams, as well as coordinating self-perform pile testing, pile production, logistics, and structural teams. I also train and mentor Assistant superintendents, General foremen, foreman and leads on best practices f... Read More
Supervisor
Helping establish a solid understanding on self-performing pile installation including but not limited to management over all front end tasks such as: -Surveying topo/pin layout for production piles, inverters pads/ combiner piles/ weather stations. -Managment over offloading I beams/ stage beams/ shake-out and logistics. -Training Foreman a... Read More
Pile Driver Professional/ Heavy Machinery Operator
Installing I beams (Piles, Piers) for McCarthy’s industrial solar branch. Operating Gaÿk’s, Turchi, & Pauselli. -spectrum laser master (360 Rotary laser) Could shoot single tracker or whole blocks with a single shot -Trained local operators to maximize there skills and sharpen there understanding on pile driving
Pile Driver
General Foreman
Managed 13 state of the art GAYK’s with integrated GPS systems located in Richmond Indiana. -Managed and transported all machines including 3 PD10R’s on job site as well as off the job site. -280MW 60,000+ piles -AxeOne Duo system (Richmond IN) -RBI system (North Carolina 2 projects)Read More
Logistics Coordinator/ 350Mw
Logistics coordinator- log,map, & inventory of materials and equipment. -properly staged modules in correct blocks/trackers in a safe yet very high paced manner, 18 pallet series 6 mod boxes offloaded by my team as fast as 15min -Averaging 20-25min truck times from opening semi gate laches to close. -Making the process easier for my st... Read More
no.history.found
Carpentry/Carpenter
Dec, 2013 - Nov, 2014
High School Diploma
Dec, 2009 - Nov, 2014
OSHA 10
Dec, 2023 to CurrentProject Manager | Rosendin
Director of Pre-Construction | Rosendin
Director of Pre-Construction | Rosendin