Worker Profile

Kaleal Ester

Lead Solar Installer

smartphone+1 123***234
mail_outlinekal***com
Los Angeles, California

Rising Worker

summary

no.summary.found

work.exp

    Milcon Commercial Concrete

  • Mar, 2020 to Dec, 2020

    Concrete Laborer

    Chestnut Oak Construction Llc

  • Aug, 2018 to May, 2019

    Iron Worker

    Hook up beams with proper rigging equipment to cranes * Operate man lifts, scissor lifts, and forklifts * Connect beams, columns, and braces on ground and in air with proper bolts & equipment * Plumb structures with proper leveling equipment. * Impa

    Us Army

  • Feb, 2015 to Feb, 2018

    Combat Engineer

    Preformed basic demolition in accordance to standard operating procedures to achieve 100% mission completion Conducted mine warfare, combat construction operations using materials and equipment valued in total $125,000 Located Improvised Explosive d

work.history

no.history.found

education
  • Greenville Senior High School

    Diploma

    Aug, 2011 - Feb, 2014

certifications

no.certificates.found

references

no.reference.found

location

no.location.found

© 2024 Site Worker. All Rights Reserved.
Terms of Use | Privacy Policy | Cookies Policy