Experienced and eager Construction Wireman(CW) available for immediate hire. Seeking employment opportunities in utility/industrial scale PV array installation or related positions. Work experience includes but not limited to: LDS (combiner box)installation/grounding, cab line installation grounding, PV wire management(array stringwire/PV2PV), torque tube/purlins racking(shakeout, assembly, erection), wire management/electrical labor support, PV module installation, tracker driveline assembly/installation, drive motor mounting/installation, site remediation/maintenance and equipment/tool operations. Computer literate in productivity software (MS Office), internet/intranet communications, mobile applications, and administrative support.
Mechanical Structure/pv Installer
Assisted in construction of HSAT solar farm (ATI DuraTrak Hz v3) Pre-stage(shake-out) assemble/mounting components for racking structure. Assembled torque tube members, tube splices, pivot cradle/pedestals, post brackets, torsion dampers(struts), and post mounts(bear collars) according design and specifications. Installed PV modules at productive levels while observing proper safety practices at operating procedures.(>1200 modules-only/per day install rate) Secured all hardware components with torque/ratchet tools... Read More
Pv Module Installer
Assisted in constructing fixed-tilt solar farm (RBI GLIDE Wave) Staged and field assembled metal racking structural components; i.e, purlins, splices, tilt brackets, horizontal braces, mounting rails, and threaded fasteners/nuts in preparation for module installation. Set racking purlins in place/attach to ground-mounted post beam using bracket connectors and fastener hardware. Physically lifting and setting PV module in place according to specification and design. Maintain high level of production during perso... Read More
Qa/qc Technician
Performed Quality Control/Quality Assurance remediation/maintenance processes to ensure proper operation and structural integrity of solar system (FlexRack: G3-X) Inspect PV modules for surface cracking, breakage, or failure points in mounting/connection. Check torque calibration and connections of fasteners(threaded bolts/nuts, clamp assemblies, lockbolts) for evidence of tensional stresses and vibration. Inspect all support components(mounting rails, tilt brackets, horizontal braces, splices, mounting plates) for m... Read More
no.history.found
Certification training
Dec, 2021 - Oct, 2022
Certificate of completion
Jan, 1991 - Mar, 1991
OSHA 30-Hour
Oct, 2024 to CurrentOSHA 10-Hour
Jan, 2020 to CurrentChief Operating Officer | Applied Materials
Operations Director | Applied Materials
Operations Manager | EA Sween Company