Always looking to develop my career and build my skills. Extremely versatile and quick learner. Quality is my specialty leadership is my strong suit 100% satisfaction is my goal.
Since 2019 I’ve built the following tracking systems 3 Next tracker, 2 Game change, 3 PVH, and a Soltec. Majority of the sites I’ve played a part in are well over 200MW. Also have done 2 smaller 70MW and a 30MW.
Career responsibilities are as follows but not limited to. Construction Management, site safety plan development, Quality audits, sub contractor testing and qc documentation, MC walks, commissioning, site turn overs.
Construction Manager
Monitoring project progress and identifying potential challenges. Implementing corrective actions to address any issues. Ensuring all construction work meets Melink Solar's quality standards. Conducting regular inspections of completed installations. Identifying and resolving quality issues promptly. Ensuring compliance with all safety regulations and company policies. Conducting safety inspections and trainings. Investigating and reporting accidents and near-misses. Leading and supervising con... Read More
General Foreman Over Qc
General foreman over all aspects of QC including foundation install (piles), tracker assembly, mod install, mod wiring, electrical, DC/MV, cab. General foreman over everything QC. Handle all the QC crews and sign offs. Foundation, pile caps, tracker install, mod install, mod wiring, mod scan. Also in charge of sign off crew for MV/DC trenching, Cab, and Fiber Optic. Take care of SOP JSA time cards. Make sure all my crew is competent in all task. Handle the first time quality percents and reports. Docu... Read More
Quality Assurance Quality Control Manager
In charge of the QC crews that are responsible for documenting any defective issues found on assembly of Soltec arrays. After they submit the documents i reviewed and created a punch list for remediation.
no.history.found
Associate degree
Aug, 2020 - Apr, 2022
OSHA 10
Dec, 2023 to CurrentOSHA 30
Sep, 2020 to CurrentCPR
Mar, 2019 to CurrentNFPA 70E
Jun, 2020 to CurrentChief Operating Officer | Babcock and Wilcox
Solar Vice President | Babcock and Wilcox
Director Of Construction | Fosler Solar